There is a day on every job when the house stops being see-through. The wrap is on, the windows are in, the insulation is tucked between the studs, and the first sheet of plasterboard goes up. From that afternoon, everything behind it is permanent.

So before that day, we walk the house with one question: where will the water go? Not whether it will come. It always comes. On this coast it comes sideways, in the first big storm of summer. The question is whether every drop has a path back outside. Here is the walk, in the order a house gets built, from the two jobs we have open this month.

New first-floor timber frame wrapped in blue wall wrap with yellow roof battens on, under a grey sky, on the beach house build
On site at our Beach House project.

The ground, before anything stands on it

On a renovation we are working on, the first thing we did after the demolition was not build. It was test. The existing concrete floor was cored and checked for moisture and for what was under it, because a new floor was about to go over it and a damp slab lifts a floor from underneath. The old walls were checked along the base for the tell-tale line of rising damp.

What we are looking for: a slab that is dry enough to build on, a damp-proof course that is doing its job, and ground outside that sits below it. If a garden bed or a path has crept up over the years, the fix is outside, and it happens now.

The frame, and whether it is dry

On the beach house, the roof came off in September and the new frame stood through three weeks of spring rain before the walls were wrapped. That is normal. Timber gets wet on site. What matters is what happens next.

Before the wrap and the lining close the frame in, the timber is checked for moisture, and it waits if it needs to. A frame closed up wet stays wet for a long time, and a wet frame inside a sealed wall is how a new house ends up with the smell of an old one. "We let it dry" is only a process if someone checks.

The wrap, and which way it faces

Once the frame is right, the walls get wrapped. The wrap is the house's raincoat under the cladding: it sheds any water that gets past the cladding and sends it down and out. On a well-detailed wall it also lets water vapour from inside the wall escape outward, so the wall can dry if it ever gets damp.

What we are looking for: laps running the right way (upper sheet over lower, like roof tiles), joins taped, and the wrap turned into every window and door opening so the next layer has something to seal to. The order matters. Wrap first, openings dressed, then windows.

Wrap first. Then windows. Then everything else.

The windows, and the sill that drains out

A window is a hole in a raincoat. Around every one there is a small system that most people never see: a sill flashing that falls outward so any water reaching it runs back out, tape up each side of the opening over that sill, and a head flashing across the top that goes on last so it laps over everything below. Each layer sits over the one beneath it, the way water expects.

On that renovation, the old windows came out so the new ones could be measured against the real openings. That also meant every opening could be looked at bare: what the old flashings had been doing, and what the new ones need to do.

The threshold, and which way it falls

Doors are windows that reach the floor, which makes the threshold the hardest-working 100 mm in the house. On the renovation, the floor is coming up about 40 mm for the new finish, so every external door threshold is being re-detailed with it: the sill flashing under the track, the track itself sitting flush with the finished floor, and the fall set so water driven under the door is sent out, not in. It is decided once, with the floor. After the doors are in, it is a floor-up job to change.

The wet areas, and the test before the tiles

A bathroom is waterproofed before it is tiled, and the tiles are not the waterproofing. A membrane goes down across the floor and up the walls, with the floor falling to the waste and every junction (floor to wall, wall to wall, around the drain) treated so the membrane can move without tearing. Then, before a single tile goes on, the shower is flooded and left. If the water level holds, the tiles go on. If it drops, the membrane is fixed while it is still reachable.

The beach house bathroom is still to come. When it does, that flood test is the moment the room is either right or not, and it is the one photo of a bathroom we would most like to show you.

The last look before the plaster

Then the walk itself: every opening, every penetration where a pipe or a cable passes through the wrap, every junction where a roof meets a wall. Each one gets the same question. Where does the water go from here? If the answer is "into the wall", the sheet does not go up that day.

Why this is worth knowing before you build

None of this is complicated, and none of it is expensive while the wall is open. What makes it hard is timing. Each check has a window of a few days, and it closes with the plaster. A builder who is involved while the drawings are still moving can set those details on paper, where changing them costs a conversation, instead of on site, where it costs a floor.

If you are planning a build or a renovation and want the water side thought through early, start a conversation here.

If you want to see the Beach House build that we are currently working on you can follow along here.

AGATHĒ builds architectural and Passivhaus homes across Sydney's North Shore, the Northern Beaches, the Hills district, the Central Coast and Newcastle, and their surrounds. Our founder Mitch Chan is a Certified Passivhaus Tradesperson, and we are members of the Australian Passivhaus Association. If you are working out how the water side of your own build should be handled, we are always happy to talk it through.

Planning work on your own home? See how we approach major renovations on the North Shore and Northern Beaches, extensions and additions, and architectural and Passivhaus homes.

Start a Conversation

Not at the conversation stage yet? If this topic has you curious, the Healthy Homes newsletter is the easy way to keep learning, with no obligation attached.