An early estimate is a range, and it should be read as one. Each stage replaces more of the estimating with real quotes from the trades, so the range narrows as your design develops.
Selections, structure and scope are worked through while they are still lines on a drawing. That is when a change costs the least.
If the design and the budget start to drift apart, you see it early, and we work through the options with you and your architect.
We work alongside you and your architect from the first estimate through to a building contract. You can sign a contract, pause or stop at the end of any paid stage, and every stage fee is credited back in full if you build with us.
An early, project-specific view of the likely cost of your new build or addition, before you invest in detailed design and documentation. We review your concept or developing plans and give you an indicative range to work with.
The estimate is broken into detailed cost lines, usually 25 to 35 of them. Everything is still estimated at this point. We may ask trades for guidance, and formal quotes wait until the drawings are developed enough to price properly. Your selections, and anything you plan to supply yourself, start to take shape.
Trades quote the developed drawings, so most of the price is now quoted, with the balance estimated. Your selections are locked. If the price and the budget do not line up, this is where we work through it with you and your architect, looking for where the design intent can be kept while cost pressure is eased.
Final quotes, the construction programme and the building contract documents. Every trade is priced. Anything still unquoted is carried as a provisional sum (an allowance that is adjusted to the actual cost once it is known) and is shown as one.
Best for: knowing whether the project is viable before you spend on full documentation. A building contract cannot be signed from this stage, because there is not yet enough detail to build from.
Selections, structure and scope are worked through before anyone arrives on site.
Every build carries some price movement. Trade and material costs can shift between the estimate and the invoice. The three contract types differ in who carries that movement, and the more of your price that is quoted, the more options open up.
You pay the actual cost of the build, plus our margin. You carry the price movement, in either direction. If items come in under their allowances, that difference stays with you, so there is a good chance you will save. There is also a chance the cost rises.
Available from the end of Stage 2You pay the actual cost of the build, and our margin is set as a lump sum at the start. That takes the movement out of one part of the price, so the risk is shared between us.
Available from the end of Stage 3One contract price. We carry the price movement, apart from any items left as provisional sums. It gives you the most certainty. It also takes longer to reach and costs more, because the risk sits with us.
Available at the end of Stage 4There is no right answer here. It comes down to how much certainty you want before the build starts, and we talk it through with you at each stage.
You commit to one stage at a time, and each paid stage is quoted for your project before it starts.
An indicative cost range, the factors shaping it, and an online consultation to walk through the findings.
Each stage is quoted for your project, depending on the size and complexity of the work.
Credited back against the preliminaries in your building contract (the site set-up and running costs of the job).
Site investigations by other specialists, such as drainage CCTV, asbestos testing or a geotechnical report, are paid directly to that supplier.
"I honestly couldn't recommend Agathe more highly, they've been absolutely fantastic. We engaged them through their PAC process, meaning they were involved right from the planning and design stage. I'll admit I was a little hesitant to pay for that upfront, but it turned out to be one of the best decisions we made. The value it's added to our project has been incredible."
Most of what decides how a build goes is settled before anyone arrives on site. Pre-construction is where we settle it with you: the scope, the price and the risks, set out clearly before you sign.